Lisanne was smart. She bought her coop. Why didn't we do that? The advantages are twofold: 1) it's finished and 2) it will likely have cost less than the one that we have built.
Today we got a lumber delivery from Home Depot. $800 later (or something like that), we have Phase 2 of our lumber needs completed. We have 50 bags of pea gravel for the run, plywood, pressure treated lumber for the run, etc. etc.
The best part about the delivery was the flatbed with a forklift attached to it. August thought this was fabulous - and at 8 in the morning no less. What a way to start the day.
Wednesday, April 15, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment